HRB400 HRB500 Hrb500e Deformed Steel Rebar Round Bar Construction Reinforcing Iron Metal Hot Rolled Round Square Stainless Carbon Steel Flat Corrugated Tmt Bar
HRB400 HRB500 HRB500e Deformed Steel Rebar Round Bar Reinforcing Iron Metal Hot Rolled Large Diameter Wire Rod Construct
Basic Info
Model NO. | ASTM/ASME SA179 SA192 |
Materials | Carbon Steel |
Diameter | 6, 10, 12, 14, 16, 18, 20, 22, 25, 28, 32mm |
Surface | Epoxy Coating, Screw-Thread, Galvanized |
Grade | HRB335/HRB400/HRB500 and etc. |
Transport Package | Seaworthy Packing |
Specification | Technique: Hot Rolled |
Trademark | Shandong Jichang |
Origin | Shandong |
Production Capacity | 80000t/Years |
Product Description
HRB400 HRB500 HRB500e Deformed Steel Rebar Round Bar Reinforcing Iron Metal Hot Rolled Large Diameter Wire Rod Construction Carbon Steel Corrugated Tmt Bar
Specifications:
- Diameter: 6-50 mm.
- Chemical composition: C - 0.27%, N - 0.013%, P - 0.065%, S - 0.065%, CE - 0.45%.
- Length: 6-12 m.
- Elongation: ≥ 14%.
- Yield strength: ≥ 460 N/mm2.
- Tensile strength: ≥ 500 N/mm2.
- Standard: BS 4449, ASTM A 615 or for your requirement.
- Cut & bent services are available.
Diameter | 6, 8, 10, 12, 14, 16, 18, 20, 22, 25, 28, 32mm |
Length | Usually clients can customize the length. Nominal size is 6, 12m |
Standard | GB: HRB335, HRB400, HRB500ASTM A615: grade 40, grade 60, grade 75, ASTM A706DIN488-1 420S/500S, BST500SJIS G3112 SD35, SD40, SD50, SD390NFA 35016 FE E400, FE E500CA 50/60 |
Surface Treatment | Epoxy coating, screw-thread, galvanized |
Production Facility | Imports of production equipment from Italy |
Production Capacity | 200000 MT per year |
Payment Term | T/T, L/C |
Package | By bundles. One bundles about 2-3 tons or as client's requests |
Application: Rebar is widely used in civil engineering construction such as houses, bridges, and roads. From highways, railways, bridges, culverts, tunnels, flood control, dams and other public facilities, to the foundations, beams, columns, walls and slabs of housing construction, rebar are all indispensable structural materials.
FAQ:
Q1: Shipping&price term?
A: Both FOB/CIF/CFR price term are ok, we have reliable forwarder helping arrange the shipment for you.
Q2: How do I pay?
A: TT and LC are acceptable and TT will be more appreciated. 30% paid for deposit by T/T before production. 70% balance to bepaid by T before shipment.
Q3: What is your terms of payment ?
A: Pavment<=1000USD, 100% in advance, Pavment=1000USD. 30% T/T in advance balance before shippment.
Q4: How do you pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid bvcustomers.
Q5: How long is your delivery time?
A: General 5-10 days if the goods are in stock. or will take 20 - 45 days if the goods are not in stock, order quantity also influence the delivery time
Send to us